Halted rocket test could stall NASA moon shot, redo possible

In this Saturday, Jan. 16, 2021 photo made available by NASA, the core stage for the first flight of NASA's Space Launch System rocket undergoes a hot fire test at NASA's Stennis Space Center near Bay St. Louis, Miss. All four core-stage engines fired for barely a minute, rather than the intended eight minutes. On Tuesday, Jan. 19, 2021, NASA blamed the automatic shutdown on the strict test limits. (Robert Markowitz/NASA via AP)
In this Saturday, Jan. 16, 2021 photo made available by NASA, the core stage for the first flight of NASA's Space Launch System rocket undergoes a hot fire test at NASA's Stennis Space Center near Bay St. Louis, Miss. All four core-stage engines fired for barely a minute, rather than the intended eight minutes. On Tuesday, Jan. 19, 2021, NASA blamed the automatic shutdown on the strict test limits. (Robert Markowitz/NASA via AP) ((NASA/Robert Markowitz) For copyright and restrictions refer to -Êhttp://www.nasa.gov/multimedia/guidelines/index.html)

CAPE CANAVERAL, Fla. – NASA is considering a second firing of its moon rocket engines after a critical test came up short over the weekend, a move that could bump the first flight in the Artemis lunar-landing program into next year.

The space agency had aimed to launch its new Space Launch System, or SLS, rocket and an empty Orion capsule by the end of this year, with the capsule flying to the moon and back as a prelude to crew missions. But that date could be in jeopardy following Saturday’s aborted test.

“We have a shot at flying it this year, but we need to get through this next step," said Kathy Lueders, head of NASA's human spaceflight office.

All four engines fired for barely a minute, rather than the intended eight minutes, on the test stand at NASA's Stennis Space Center in Mississippi. The countdown rehearsal for the 212-foot (65-meter) core stage — made by Boeing — included the liquid hydrogen and oxygen tanks, as well as the all necessary computers and electronics.

On Tuesday, NASA attributed the automatic shutdown to the strict test limits meant to protect the core stage so it can be used on the first Artemis flight. The hydraulic system for one engine exceeded safety parameters, officials said, and flight computers shut everything down 67 seconds into the ignition.

Two other engine-related issues also occurred.

NASA said it can adjust the test limits if a second test is deemed necessary, to prevent another premature shutdown. Engineers will continue to analyze the data, as managers debate the pros and cons of proceeding with a second test firing at Stennis or shipping the rocket straight to Florida's Kennedy Space Center for launch preparations. Some of that Kennedy work might be able to be streamlined, Lueders said.

This core stage can be loaded with super-cold fuel no more than nine times, NASA Administrator Jim Bridenstine told reporters Tuesday evening. A second full-blown test firing would reduce the remaining number of fill-ups.